CDOTs Scheduled Lane Closures for the Week of July 22nd‏

Projects are listed in highway order then by direction and milepost. Work is weather dependent.


I 25 Northbound Between Pikes Peak Int’l Raceway and Fountain (Milemarker 121-122)
(through August 2012)
24 Hours- MO-FR Single lane closed 24 hours MO-FR for bridge reconstruction on 5 bridges. 12 ft. width restriction
in effect northbound I-25 only during closure. Delays possible.
US 160 Eastbound/Westbound Mancos East (Milemarker 57-62) (through November 2012)
7:00 AM-6:00 PM MO-FR There will be one lane alternating traffic for paving operations. Delays possible.
US 24 Eastbound/Westbound on the East Side of Wilkerson Pass (Milemarker 254.3)
(through July 2012)
7:00 AM-5:00 PM MO-TH There will be one lane alternating traffic for paving operations. 10 minute delays
possible.
US 24 Eastbound/Westbound 2 miles West of Peyton (Milemarker 327.1) (through July 2012)
7:00 AM-5:00 PM MO Traffic is now on the detour route around the bridge construction. Occasional traffic stops
possible to allow trucks to enter and exit the work zone. Minor delays. A 12 ft width restriction is in effect and the
speed limit has been reduced.
US 40 Eastbound/Westbound US 40/287 Through Kit Carson (Milemarker 443-445.6) (through
November 2012)
24 Hours- Only one lane open in each direction for roadway construction. One-lane alternating traffic on CO 59 at US
40/287 possible 24/7 for storm sewer and inlet installation. Delays possible. Speed limit reduced to 35 mph. 12 ft.
width restriction in effect.
US 50 Eastbound/Westbound Between Rocky Ford and Manzanola (Milemarker
361.9-366.45) (through August 2012)
6:00 AM-Dark MO-TH and FR until 4:00 PM Only one lane open in each direction for culvert work, sediment
removal, and concrete work. A 12 ft. width restriction is in effect through the work zone.
US 50 Eastbound/Westbound From Granada through Holly (Milemarker 454-462) (through
July 2012)
6:30 AM-6:00 PM MO-FR There will be one lane alternating traffic for a chip seal project. 15 to 20 minute delays
expected.
CO 101 Northbound/Southbound South of Las Animas over the Purgatoire River and Dry
Gulch (Milemarker 2.5-8) (through November 2012)
24 Hours Traffic will be managed with a one-lane alternating traffic signal 24/7 for bridge structure replacement over
the Purgatoire river and at Dry Gulch. Additional traffic stops are possible MO-FR 6:30a-6:30p. 10 minute delays
possible during additional traffic stops.

CO 115 Eastbound/Westbound on NORAD Bridge Road over CO 115 (Milemarker 43)
(through August 2012)
24 Hours- NORAD Road Bridge over CO 115 will be closed 24/7 to through traffic for bridge deck repairs. The
diamond ramps connecting to O’Connell Blvd. and NORAD Rd. remain open. Northbound SH 115 can detour south
on SH 115 and make a legal U-turn at the Gate 1/Cheyenne Mountain State Park (CMSP) intersection or enter
the park, utilize the roundabout and traffic signal to turn north onto SH 115. Access to southbound SH 115 is
available by going north on SH 115, and turning around at the South Academy Boulevard Interchange.
CO 115 Northbound/Southbound at Wilderness Road – Fort Carson Gate 6 (Milemarker
38.7-40) (through August 2012)
7:00am-7:00pm MO-FR Traffic impacts generally are minimal, with lane shifts on SH 115, and shoulder closures
through the work area for roadway reconstruction. However, traffic may need to be stopped occasionally for various
construction activities. Speed limit reduced to 40 mph through the work zone.
CO 12 Eastbound/Westbound Over the Cucharas River North of Cuchara (Milemarker 12.95)
(through October 2012)
24 Hours Traffic will be managed with a one-lane alternating traffic signal 24/7 for bridge structure replacement
over the Cucharas River. 10 minute delays expected with up to 20 minute traffic holds possible. A 12 ft. width
restriction is in effect through the work zone.
CO 12 Eastbound/Westbound Over the Purgatoire River West of Weston (Milemarker 46.66)
(through October 2012)
24 Hours There will be one lane alternating traffic Traffic will be managed with a one-lane alternating traffic signal
24/7 for bridge structure replacement over the Purgatoire river at milepost 46.66. 20 minute delays possible. A 12 ft.
width restriction is in effect through the work zone.
CO 21 Northbound/Southbound Powers Boulevard Between Woodmen Road and E. Milton
Proby Parkway (Milemarker 140.5) (through September 2012)
8:00 PM-5:30 AM SU-FR Single or double lane closures northbound and/or southbound Powers for asphalt removal
and paving operations. Speed limit reduced to 35 mph through work zone.
CO 21 Northbound/Southbound Powers Boulevard Between Union and Briargate
(Milemarker 150.5) (through August 2012)
9:00 PM-7:00 AM WE-FR, 24 Hours- Left turn lane and right through lane closed on eastbound and westbound Union
and Briargate Pkwy for road reconstruction. WE-FR, the intersection of Union and Powers will be closed for concrete
staining 9p-7a each night. Delays possible. Speed limit reduced through work zone.
CO 69 Northbound/Southbound South of Westcliffe (Milemarker 49.5) (through October 2012)
7:00am-5:00pm MO-TH and FR until 3:00pm Traffic stops up to 15 minutes for detour construction around the
Antelope Creek Bridge for bridge reconstruction. 15 minute delays. Speed limit reduced to 40 mph. 12 ft width
restriction will be in effect through the work zone. Project hotline – 719-431-9595.

CO 94 Eastbound/Westbound Between US 24 and Ellicott (Milemarker 3-16) (through October
2012)
6:00 AM-7:00 PM SU, 8:00 AM-4:00 PM WE and TH, 9:00 AM-4:00 PM FR, 6:00 AM-7:00 PM SA There will be
one lane alternating traffic SU, for paving operations from Corral Valley to 2.5 miles west and from Franceville Coal
Mine to Blaney Rd. WE-FR, shoulder closures at various locations for guardrail work. SA, One-lane alternating from
Franceville Coal Mine to 1 mile west for paving operations. Delays possible.